New Home & Dwelling Building Permits – Gippsland & South East Victoria

Planning a new home or residential unit? We manage the complete Building Permit process, from application and document review through to mandatory inspections and final approval.

Building a New Home? Start with the Right Permit

Complete support for new dwelling permit applications

If you’re building a new house or residential unit, you’ll need a Building Permit before any work starts on site. We manage new dwelling permits across South East Victoria and Gippsland, working with Builders, Developers and Owner-builders to ensure all documentation is correct and approvals are issued without delay.

Why Choose Us For New Dwelling Permits

• Full documentation review before submission
• Local knowledge of zoning, overlays and site requirements
• Fast, accurate permit preparation
• Ongoing support through inspections and certification

A permit is required before any residential build begins

• For all new homes or units, regardless of size
• Before excavation, slab preparation or construction
• If building on a site with planning overlays or bushfire risk
• If part of a subdivision, dual occupancy or multi-lot project
• Where drainage, services or neighbouring properties may be affected
Not sure what's next? Give us a call or send us your plans and we’ll advise you on the next steps.

Our Process

Our work spans everything from backyard builds to large commercial developments across Gippsland, and South East Victoria.
Review Your Plans
We assess your architectural drawings, engineering, and planning approvals to prepare for submission.
Confirm Site Requirements
We identify overlays, BAL ratings, or drainage needs that may affect your permit.
Prepare and Lodge the Application
We complete the application and submit it to the appointed Surveyor for assessment.
Respond to Surveyor Feedback
We manage any RFI (Request for Information) responses or amendments required.
Coordinate Inspections
We support mandatory stage inspections until the final occupancy certificate is issued.

What You'll Need To Provide

To get started, you’ll typically need:
• Full working drawings and site plan
• Title, property information and council planning details
• Soil test and structural engineering
• Owner-builder certificate (if applicable)
• BAL assessment (if required)
• Drainage plans and service connections
• Truss layouts and specifications

Frequently Asked Questions

Yes. A building permit is required for any new dwelling in Victoria, regardless of size or location.
We can help identify the level of risk and what extra documentation or construction measures may be required.
You can, but most builders or owner-builders prefer us to manage the process. We ensure the submission is accurate and complete the first time.
With complete documentation, most permits are issued within 3–4 weeks. Delays are usually due to missing reports or design issues.

Trusted and Qualified

cfa
chisholm
box hill
tafe vic
homesglen
Registered-building-practitioner-victoria-building-commision-logo
bpc3

Have your plans ready?

Upload them here and book a time to speak with us.

See More Services

From granny flats to demolition permits, we help ensure your build is compliant from start to finish.

New Dwelling Permits

Shed Permits

Deck Permits

Extensions, Alterations and Additions Building Permit

137B Owner Builder Defects Report

Pergola Permits

Verandah Building Permits

Garage & Carport Permits

Swimming Pools, Spas and Safety Barrier Permits

Retaining Wall Permits

Pool Compliance (Form 23)

Demolition Permits

Re Stumping/Re Blocking Building Permits

Fence Permits

Relocation of Dwelling Permits

Bushfire Attack Level (BAL) Assessments

Contract Mandatory Building Inspections

Small Second Dwelling Permits

Essential Safety Measure Audits (ESM’s)

Commercial Building Permits